Sponsored content: LATEST Jobs Updates WBSSC GROUP C D 591 Vacancies: Notification
UPSC EXAM CALENDAR 2018-2019: Notification RRB ALP Technician 26502 Vacancies : Admit Card
Railway RPF RPSF Jobs 2018: 19952 Posts Admit Card AAI Jr Executive / Manager Form 2018: 908 Vacancies
Railway Group C D Jobs : 62907 Posts Admit Card SOL DU Admissions 2018-19: Apply Online

Ojas AE AEE Exam Admit Card 2018 Assistants Engg. Additional Asst. Engg. Call Letter Syllabus

Ojas AE AEE Exam Admit Card 2018 Assistants Engg. Additional Asst. Engg. Call Letter Syllabus:

The Gujarat Water Supply & Sewerage Board is going to conducting the written exam for the post of Assistants Engineer and Additional Assistant Engineer and those applicants are applied the application form all are looking for the Ojas AE AEE Exam Admit Card finding on official website or other website so, you have to wait for the correct time Ojas AE AEE Exam Hall Ticket will be as soon as soon update on official website.

Ojas AE AEE Exam Admit Card 2018

Ojas AE AEE Exam Admit Card 2018Those who are waiting for the Ojas AE AEE Exam Admit Card still wait for the some time Ojas AE AEE Exam Hall Ticket update date is not set so, you have to wait for the correct this time Ojas Assistants Engineer Additional Assistants Engineer post exam permission letter will be very soon update on web-portal. Exam Date to 10 days back update exam hall ticket update on official website candidates for more update stay connected our website for latest update.

S. No Exam Paper Subject Name No. of Marks Time Duration
1. Written Test I General Engineering (Civil or Mechanical) 75 3 hours
2. II Sub Divisional Works Accounts 75 3 Hours
3. III Special Subject Water Supply or Sanitation Engineering (or) Mechanical Engineering & Bore drilling Technology 75 3 Hours
4. IV Practical Drawing (Civil or Mechanical) 25 75 Minutes
Total 250 Marks

Exam Syllabus

General (Civil Engineering)

  • Cement.
  • Composition and manufacture-storing, varieties and uses.
  • Normal and rapid hardening cement, Properties and l.S.S.tests.
  • Cement Mortar.
  • Composition.
  • Preparation and uses, properties, strength and tests.
  • Gauged mortars – proportioning of materials in mortars.
  • Effect of water content.
  • Cement Concrete.
  • Aggregates (coarse and fine).
  • Cement and water.
  • Proportioning and mixing.
  • Real, nominal and field mixes, bulking of sand.
  • Grading of aggregates, water-cement ratio, placing and curing.
  • The strength of various mixes and uses.
  • Ready Mix Concrete and Admixtures.
  • Damp Proofing/ Water Proofing.
  • General principles of designing foundations.
  • Types of soils and safe bearing pressure on the various types of soils.
  • Masonry (various types): Brick masonry/Stonemasonry.
  • Drafting specifications for various items in construction.
  • Analysis of rates and schedule of rates.

Sub Divisional and works Accounts

  • Internal records of accounts.
  • Stores.
  • Initial records, receipts and issues including issues to contractors.
  • Material at site accounts.
  • B1-B2Tenders.
  • Measurement books, taking of measurements, use and maintenance of measurement books.
  • Schedule of Rate.
  • Delegation of powers.
  • Various Types of Approvals for Projects (WS & Drainage).
  • Importance of action plan & Elements.
  • Contractors.
  • Rules regarding contracts as embodied in the different forms of agreements.Contractor’s bills.
  • Piecework and contract work.
  • Aid and advances to contractors.
  • B1-B2Tender.
  • PPP Models.
  • Standard Tender Documents.
  • DTPs.

ગુજરાત Water Supply Engineering સિલ્લાબુસ 2018

Planning:

  • Objective of public protected water supply.
  • Basic Design Considerations.
  • Design Period.
  • Population forecast.
  • Per capita water supply – Criteria.
  • Peak factors.
  • Qualitystandardsconsiderations.

Project Feasibility Report:

  • Background.
  • The proposed project – Long term plan for water supply.
  • Project Report.
  • Google Earth & Google Map for the Survey Work of RWS.
  • Various types of approval for regional water supply & drainage projects.
  • institutional and Financial aspects.
  • Conclusions and recommendations for the project.

Measurement of FIow:

  • Flow measurement in open channels.
  • Notches.
  • Weirs.
  • Flumes.
  • Drops.

Measurement in closed conduits:

  • Differential pressure devices.
  • Venturi meters.
  • Orifice plates and nozzles.
  • Pilot tubes.
  • Water meters.

Sources of Supply:

  • Kinds of Water Sources and their characteristics.
  • Water from precipitation.
  • Surface Waters.
  • Ground waters.
  • Salinity ingress.
  • Sanitary survey.

Hydraulics of conduits:

  • Formula.
  • Coefficient of roughness.
  • Mannings / Hazen Williams formula.
  • Experimental estimation of C value.
  • Cost-effective design of pipeline (Rising as well as Gravity main) (Manual & Software based).
  • Resistance due to specials and appurtenances

Types of pipes:

  • Specifications for manufacture, supply, laying, jointing, commissioning the following pipes.
  • Cl Pipes.
  • MS pipes.
  • AC pipes.
  • Prestressed concrete pipes.
  • PVC pipes.
  • GRP pipes.

Appurtenances:

  • Line Valves.
  •  Sluice Valves.
  • Butterfly valves.
  • Globe Valves.
  • Scour Valves.
  • Air Valves.
  • Pressure relief valves.
  • Check valves.
  • Surge Tanks.
  •  Pressure releasing and sustaining valves.
  •  Ball valves or float valves.
  • Automatic shut-off valves etc.

Water Treatment:

  • Water Quality Parameters.
  • Physical characteristics.
  • Chemical properties.
  • Biological properties.
  •  Methods of Treatment and flow designs.
  • Conventional Water treatment.
  • Aeration.
  • Flash mixing and alum handling.
  • Clariflocculator.
  • Filtration ( SSF & RSF ).
  • Dual media filters.
  • Pressure filters.
  • Disinfection.
  • Chlorination.
  • Ozonization.
  • UV treatment.
  • Application of chlorine, chlorine demand, residual chlorine, chlorine dose, handling chlorinators etc.
  • Specific Treatment processes.
  • Reverse Osmosis.
  • Defluoridationplants.
  • Water softening plants.
  • Service Reservoir.
  • Pumping stations and pumping machinery – Selection and type of pumping machinery.

Waste Water Engineering

  • Aim and Objective of Sewage disposal.
  • Definitions of common terms used in Waste Water Engineering.
  • Systems of Sanitation.
  • Conservancy system and Water Carriage system.
  • Sewer appurtenances.
  • Pumping of sewage.
  • Characteristics’ of sewage ( BOD, COD etc).
  • Sewage treatment processes.
  • Conventional treatment.
  • Biological treatment.
  • Activated sludge process.
  • Oxidation ponds and ditches.
  • Anaerobic processes like UASB etc.
  • Tertiary treatment and recycling of sewage.
  • PPP model.

Practical and Viva Voice Test

  • Practical and oral test in surveying and setting out.
  • Care and adjustment of levels.
  •  Levelling and reduction of levels.
  • Setting out angles.
  • Setting out a plan on the ground.
  • Google Earth & Google Map for the Survey Work of RWSS.
  • MIS Software.
  • Application of Branch & Excel.
  • Survey & levelling.

Click here Download the AEE Exam Admit Card 2018

Official Website of GWSSB Board: www.ojas-gujnic.in

Live Market

Rank Name Price
#1

Bitcoin
(BTC)

INR 732099.951141
USD 10254.5778778

#2

Ethereum
(ETH)

INR 15654.2339101
USD 219.270006095

#3

XRP
(XRP)

INR 21.365031807
USD 0.2992615724

#4

Bitcoin Cash
(BCH)

INR 22711.8790329
USD 318.126960576

#5

Litecoin
(LTC)

INR 5430.6843594
USD 76.0679953693

#6

Tether
(USDT)

INR 71.6250599072
USD 1.0032574837

#7

EOS
(EOS)

INR 282.471250296
USD 3.9565955849

#8

Binance Coin
(BNB)

INR 1524.31508587
USD 21.3511935549

#9

Bitcoin SV
(BSV)

INR 8702.55262222
USD 121.897294845

#10

Stellar
(XLM)

INR 5.7055714331
USD 0.0799183588

#11

Cardano
(ADA)

INR 3.728079462
USD 0.0522194833

#12

Monero
(XMR)

INR 5407.06685021
USD 75.7371831805

#13

TRON
(TRX)

INR 1.253081293
USD 0.0175520019

#14

UNUS SED LEO
(LEO)

INR 78.1142205803
USD 1.0941516347

#15

Huobi Token
(HT)

INR 291.251047611
USD 4.0795748519

#16

Dash
(DASH)

INR 7093.4295507
USD 99.3581895955

#17

IOTA
(MIOTA)

INR 21.079704697
USD 0.2952649746

#18

Tezos
(XTZ)

INR 79.470316543
USD 1.1131465706

#19

Ethereum Classic
(ETC)

INR 443.347466718
USD 6.2100005844

#20

NEO
(NEO)

INR 688.684158055
USD 9.6464496698

#21

Chainlink
(LINK)

INR 131.945391728
USD 1.8481688094

#22

Cosmos
(ATOM)

INR 220.39971779
USD 3.0871550624

#23

Maker
(MKR)

INR 38325.4301098
USD 536.827119232

#24

Ontology
(ONT)

INR 57.2053247982
USD 0.8012791932

#25

NEM
(XEM)

INR 3.3336503409
USD 0.0466946856

#26

USD Coin
(USDC)

INR 71.4678641033
USD 1.0010556305

#27

Crypto.com Coin
(CRO)

INR 2.8312653044
USD 0.0396577414

#28

INO COIN
(INO)

INR 149.090704715
USD 2.0883244699

#29

Zcash
(ZEC)

INR 3586.73018907
USD 50.2395936417

#30

Dogecoin
(DOGE)

INR 0.1933401898
USD 0.0027081303

#31

HedgeTrade
(HEDG)

INR 66.4599669938
USD 0.9309096473

#32

Basic Attention Token
(BAT)

INR 13.7042798029
USD 0.1919568555

#33

Decred
(DCR)

INR 1643.18299429
USD 23.0161850935

#34

VeChain
(VET)

INR 0.2990355402
USD 0.0041886128

#35

Paxos Standard
(PAX)

INR 71.4846880058
USD 1.0012912842

#36

V Systems
(VSYS)

INR 8.6111345503
USD 0.1206167952

#37

Qtum
(QTUM)

INR 157.031020398
USD 2.1995450558

#38

ThoreNext
(THX)

INR 695.812183765
USD 9.7462924504

#39

Bitcoin Gold
(BTG)

INR 778.053074417
USD 10.8982466564

#40

TrueUSD
(TUSD)

INR 71.493273665
USD 1.0014115441

#41

MineBee
(MB)

INR 7.0387071111
USD 0.0985916884

#42

ZB
(ZB)

INR 25.52544646
USD 0.3575368065

#43

ThoreCoin
(THR)

INR 131838.097977
USD 1846.66593797

#44

OmiseGO
(OMG)

INR 81.4164252501
USD 1.1404058585

#45

Ravencoin
(RVN)

INR 2.4493751975
USD 0.0343085786

#46

KuCoin Shares
(KCS)

INR 111.280616207
USD 1.5587157784

#47

0x
(ZRX)

INR 16.2346213377
USD 0.2273995355

#48

EDUCare
(EKT)

INR 12.1399046731
USD 0.1700445379

#49

Nano
(NANO)

INR 67.6339671568
USD 0.9473539539

#50

Karatgold Coin
(KBC)

INR 2.2196202137
USD 0.0310903836

Leave a Reply

Your email address will not be published. Required fields are marked *